Designed specially for mid-range cars, suitable for a vast variety of vehicles.

 

Lightweight, shock-resistant, plastic housing

Many extra tuning options

Auto Calibration

Injector heating

Diagnostic

Waterproof

32 pins

Suitable for 2-3-4 Cylinders

SKU: ENR.E40032 Category:
E300  4 Cylinder

 

E300 is comes from the experience gained during E400  development in which there have been some changes resulting in a product with an excellent value for money . The connector used in E300  is automotive type 32 poles.

Aria 32 makes a diagnosis of all gas components in real time , viewing any errors on the switching LEDs. The verification of the problems incurred can be deepened by the calibration software at any time.

The connection to the engine signals, offers exceptional qualities of connective security and protection against water infiltration.

 

TECHNICAL DATA

Supply Voltage: 10 – 16 Volts CC
Working temperature: -20 / + 105 °C
Power consumption: – stand-by (key Off): < 20 mA
        – no load ready to change (key On): < 160 mA
Gas Injectors supported: 2, 3, 4
Injectors Impedance: da 2 a 16 ohm
Lock-off load on single input: 2 (Imax = 4A cad.)
Inputs for lock-off / Services: 2
Water temper. sensors supported: 4,7 – 10 kohm
Gas temper. sensors supported: 4,7 – 10 kohm
Pressure sensors supported: 4+2,5 bar Absolute
Level sensors supported: 0..5V – 1050 & 806 compatibles – 0..90 ohm
(others on demand)
Lambda sensors managed: 0-0,8 / 0-5 / 5-0 / 0,8-1,6 / 2,5-3,5 / UEGO
Lambda emulation possible for all managed type
Change-over Switch: Pushbutton, gas level shown, operating led, ready-to-change blinking, diagnostics, Buzzer
Interface: 4 poles AMP on the loom for custom USB or Bluetooth interface

CERTIFICATIONS

  • ECE 67R-01
  • ECE 110R-00
  • ECE 10R-03

KIT CONTENT

  • 1 x ECU Unit with standard plastic box + back cover in aluminum
  • 1 x “Intelligent” change-over switch
  • 1 x pressure sensor type 4+2,5 Absolute
  • 1 x standard loom CA0316
  • 1 x fuse (7,5 A) and fuse holder bag
  • 1 x shrink tube bag (4 cyl)
  • 1 x Wiring diagram
  • Packing: 1 box per kit, 120 box in a carton, 2 cartons per pallet (extra cost will be charged if 1 pallet per carton is needed